QUOIN
ConsultTalk to Experts

Service

Electrical

A licensed electrician takes the load schedule through to a tested installation — conduits, wiring, the board and every point terminated and labelled.

What is included

  • Load schedule and point layout
  • Conduiting and wiring to the board
  • Distribution board, MCBs and earthing
  • Fitting and testing of switches, sockets and fixtures

What it does not cover

  • Utility meter applications and supply upgrades

Stated up front on purpose. Most disputes on a building site are about a line somebody assumed was in the quote.

What you need to provide

  • Site access with the supply isolated for testing
  • The load list or appliances you plan to run
  • Existing wiring diagrams, if any

Duration, availability and area

Duration
Site visit is about 45 minutes; repairs are usually same-day.
Availability
Your preferred day is confirmed by a person at Quoin before anyone visits.
Service area
Areas Quoin currently serves. Check your area

Other services

See all

Electrical

Quoted per point, or per day for repairs.

Get a quote